济南冷库安装讲解冷库安装机组安装规范知识

1、散热器安装散热器安装位置离主机越近越好,最好在主机偏上位,散热器安装位具备最佳散热环境,吸风口不能对着其它设备出风口,特别是油性气体,出风口不能短路及对着别处窗口(特别是居民窗口)和设备,离地应有2M高,安装水平牢固。

1, radiator radiator installation position as close to the host, the better, the best in the host, radiator installation has the best thermal environment, absorb not to the other equipment outlet, especially the oil gas, outlet can't short circuit and elsewhere on the window (especially the residents window) and equipment, should be 2 m from the ground, installed firmly.

2、铜管排放所有铜管需分别穿保温管与同方向电线一起用空调扎带一起包扎好,尽量走直管样并分段固定,保温管与保温管接头处用电工胶布密合。

2 respectively, the pipe emissions all need to wear insulating tubes with the same wire cable tie bind together with air conditioning, try to walk straight pipe fixed sample and segmented, thermal insulation pipe and heat pipe line with electrical tape or joint.

3、电线排放所有电线除用空调扎带扎好外,需用波纹软管或走线槽穿管保护,温度显示导线尽量不与电线靠在一起。

3, electrical, emissions all wires, besides using air conditioning cable tie fasten with corrugated hose or go trough wear protection, temperature display wire to wire together as far as possible.

4、制冷系统连接因主机冷凝器、蒸发器在厂里都经过打压密封,因此开封时,都应有压力,可查是否有漏,出厂铜管应两头有封尘措施,施工时也要注意随时密封,以防水灰尘进入管内,冷凝器→主机→蒸发器,铜管连接以焊接方法,接口牢固美观。

And by host condenser, evaporator, refrigeration system have been suppressed sealed in the factory, so in kaifeng, should have the pressure, to check whether there is leakage, factory copper pipe should be two head seal dust measures, also should pay attention to during the construction of seal at any time, to waterproof and dust into the tube, to host, evaporator, condenser copper pipe connected to the welding method, the interface is strong and beautiful.

5、电器导线性能配置导线线径达到要求,接头牢固,需保护穿管则不能省,接电正确。导线进蒸发器接线盒孔,需硅胶密封,接灯如是36V电以上则需接地线,主机电柜内进电需三相五线制,要有可靠接地。

Line 5, electrical conductor performance with wire diameter up to par, joint is firm, to protect wear tube is not the province, connected correctly. Wire connector holes into the evaporator, silicone seal, pick light more than 36 v battery need to be ground wire, host in electric cabinet into electricity to three-phase five wire system, must be reliable grounding.

6、温控探头安装探头与温度显示探头一齐穿入库内蒸发器回风口,且悬空,化霜温控也固定在天板上,探头另穿孔入库内蒸发器回风口,探头插入翅片中(不能靠近电热管),温控及化霜温控固定在库内蒸发器后一角,所有接线处密封。

6 installation, temperature sensor probe and temperature display probe wear into the Treasury within the evaporator inlet together, and hung up, frost temperature control board is fixed to the day, probe the other punch into the Treasury within the evaporator inlet, probe into wings in (near) electric heating tube, temperature control and temperature control of frost fixed in a corner of the rolls after the evaporator, seal all wiring.

7、平衡窗安装不要装在显眼处及出风口立板上,高度为立板上部下来200MM开孔。

7, balance the window installation don't in a prominent place and outlet vertical plate, the height of vertical plate upside down 200 mm hole.

8、库板的密封所有贯穿库板的部件,库板与部件缝隙需用密封胶密封。

8, library board seal all throughout parts of base plate, base plate and sealing parts gap with sealant.